Fire-Rated Doors for Dubai Luxury Hotel
Challenge
A 5-star hotel in Dubai Marina required 120+ fire-rated doors meeting UAE Civil Defence (CD) standards, with a 6-week delivery window and on-site installation support. Standard lead times from European suppliers were 12-16 weeks.
Solution
RHIDOOR engineered and manufactured 60-minute and 120-minute fire-rated steel doors with intumescent seals, CERAMB brand fireproof panels, and European-grade locksets. All doors were pre-hung in custom frames with factory-fitted hardware to reduce on-site labour.
Result
Delivered and installed in 5.5 weeks — ahead of schedule. Passed UAE CD inspection on first attempt. The hotel chain has since specified RHIDOOR fire doors for two additional properties under construction.